Project Name : |
BMA Mass Transit Study
|
Project Owner : Bangkok Metropolitan Administration
Main Contract : -
Project Cost : 2.8 Million Bath
Prportion (%) :100
Performance Year : June 2544-August 2544
Cost of Work Responsible : 2.8 Million Bath
Work Features : Feasibility study
Detail of Works : Provide the service for the administration to Department of traffic and
transportation by providing inhouse engineers and lawyer to manipulate
and analyze on traffic problem, mass transit system studies and
including administration on all of mass transit type eg. BMTA, BTS, micro
bus service and river transportation.
|
|
Project Name : |
The study of Land Bank for developing into Intermodal station on Southern Bangkok region
|
Project Owner : Bangkok Metropolitan Administration
Main Contract : Krungthep Tanakom
Project Cost : 7.2 Million Bath
Prportion (%) :53
Performance Year : April 2543-January 2544
Cost of Work Responsible : 2.8 Million Bath
Work Features : Feasibility study
Detail of Works :
Detail of Works Study in term of procuring landabank and preparing the budget,
utilities, land recreation for future development cover of southern
region (Phasricharoen, Jomthong and Thonburi Prefecture)
region (Phasricharoen, Jomthong and Thonburi Prefecture)
|
|
Project Name : |
The study of Bangkhuntien and Thungkru prefecture develop into Green area
|
Project Owner : Bangkok Metropolitan Administration
Main Contract : Krungtep Thanakom
Project Cost : 9.8 Million Bath
Prportion (%) :23
Performance Year : May 2543-May 2544
Cost of Work Responsible : 2.8 Million Bath
Work Features : Feasibility Study
Detail of Works : Project aim is studying and planning to develop land physical which
suitable for the economic, culture, environment and upgrade the
existence of local inhabitant.
|
|
Project Name : |
Study of Restriction Area for Environmental Control of Rayong Province
|
Project Owner : Office of Environmental Policy and Planning Province
Main Contract : -
Project Cost : 5.0 Million Bath
Prportion (%) : 100
Performance Year : August 2540-February 2541
Cost of Work Responsible : 0.5 Million Bath
Work Features : Feasibility Study
Detail of Works : Collecting the environmental impact data and analyze by the GIS modification application software to find the restriction area for environmental control of Rayong Province
|
|
Project Name : |
Project Study and Planning for Main River Network in Northern, Eastern and North-eastern Region
|
Project Owner : Public Works Department
Main Contract : Epsilon Co., Ltd.
Project Cost : 15.0 Million Bath
Prportion (%) : 35
Performance Year : August 2540-February 2541
Cost of Work Responsible : 5.3 Million Bath
Work Features : Geographic Information System
Detail of Works : Collecting the existing condition of bridge which crossing the main river in the studying area . Analyze for the most highest priority by ranging the probably to construction in the future by using the application GIS software.
|
|
Project Name : |
Third Stage Expressway
|
Project Owner : Public Works Department
Main Contract : Epsilon Co., Ltd.
Project Cost : 52.4 Million Bath
Prportion (%) : 5
Performance Year : August 2539-May 2540
Cost of Work Responsible : 2.5 Million Bath
Work Features : Feasibility study and detail design
Detail of Works : Preparing the topographic map, cross-section and profile from aerial photograph fixing the route alignment, establish the horizontal and vertical control monuments.
Carried out the properties map which declare the land, housing and building owner include with its quantities.
|
|
Project Name : |
Dao-Kanong-Samut Sakorn Expressway
|
Project Owner : Airports Authority of Thailand
Main Contract : TEC Co., Ltd.
Project Cost : 30.0 Million Bath
Prportion (%) : 1
Performance Year : August 2539-October 2539
Cost of Work Responsible : 0.2 Million Bath
Work Features : Feasibility Study and detail design
Detail of Works : Providing rectified Photo scale 1:1,000 form aerial photograph scale 1:6,000 by soft photogram and making the arial photomosaic cover the project area
|
|
Project Name : |
Industrial Ring Road
|
Project Owner : Public Works Department
Main Contract : Epsilon Co., Ltd.
Project Cost : -
Prportion (%) : 46
Performance Year : September 2539-October 2539
Cost of Work Responsible : 1.0 Million Bath
Work Features : Fesibility Study and detail design
Detail of Works : Survey for the topographic map, profile and cross-section in the area "Bang Kra-Choa" in Amphoe Phra Pradaeng preparing for the preliminary design of the alteration between bridge and tunnel cross the Chao Praya River. Including the properties survey for land housing and building in the area right of way.
|
|
Project Name : |
Feasibility and Planning for Major Bridge Networking
|
Project Owner : Public Works Department
Main Contract : Epsilon Co., Ltd.
Project Cost : 7.0 Million Bath
Prportion (%) : 36
Performance Year : November 2538-April 2539
Cost of Work Responsible : 2.5 Million Bath
Work Features : Geographic Information System
Detail of Works : Study and implementation the GIS system for searching the major bridge networking in the provincial area for future construction or planning.
|
|
Project Name : |
Preliminary design for the Pak Kret Bridge cross the Chao Phraya River
|
Project Owner : Public Works Department
Main Contract : Epsilon Co., Ltd.
Project Cost : 12.0 Million Bath
Prportion (%) : 17
Performance Year : October 2537-December 2537
Cost of Work Responsible : 2.0 Million Bath
Work Features : Feasibility study
Detail of Works : Preparing the topographic map from the aerial photograph with the cross-section and river profile by echo sounding and survey for the obstruction in the right of way.
|
|
Project Name : |
Feasibility Study for the Chiang Mai Mass Transit Project
|
Project Owner : Expressway and Rapid Transit Authority of Thailand
Main Contract : Epsilon Co., Ltd.
Project Cost : 27.0 Million Bath
Prportion (%) : 7
Performance Year : April 2538-May 2538
Cost of Work Responsible : 1.9 Million Bath
Work Features : Feasibility study
Detail of Works : Cooperate with design and environmental team preparing the topographic map and aerial photograph in the Chiang Mai city and survey for the road connectivity preparing for the traffic engineer.
|
|
Project Name : |
Common Utilities Duct Project
|
Project Owner : Bangkok Metropolitan Administration
Main Contract : Epsilon Co., Ltd.
Project Cost : 37.0 Million Bath
Prportion (%) : 9
Performance Year : October 2537-May 2538
Cost of Work Responsible : 3.2 Million Bath
Work Features : Feasibility and preliminary design
Detail of Works : Providing rectified aerial photograph, topographic map, profile, cross-section and under ground utilities for the preliminary design and preparing the GIS data with application program to use with the presentation stage.
|
|
Project Name : |
Preliminary Design for the Bang Phlat, Tha Phra, Rattchayotin and Mahai Sawan Underpass
|
Project Owner : Bangkok Metropolitan Administration
Main Contract : Epsilon Co., Ltd.
Project Cost : 5.0 Million Bath
Prportion (%) : 18
Performance Year : April 2538-October 2538
Cost of Work Responsible : 0.9 Million Bath
Work Features : Preliminary design
Detail of Works : Topographic and obstruction survey include with the rectified aerial photograph and survey for the site plan, cross-section and profile.
|

|
Project Name : |
In-house Engineering Service for survey, design, and the analysis for bridge and road Phase 5.
|
Project Owner : Bangkok Metropolitan Administration
Main Contract : Krungtep Thanakom
Project Cost : 2.72 Million Bath
Prportion (%) :100
Performance Year : February 2544-November 2544
Cost of Work Responsible : 24.0 Million Bath
Work Features : Supervision
Detail of Works : Providing the Engineer service on survey work, conceptual and
preliminary design (road, bridge, highway and intersection) and
structure analysis for the dirary and routine work of the department of
public works.
|
|
Project Name : |
In-house Engineering Service for Survey, Design, and Analysis for Bridge and Road, Phase 4
|
Project Owner : Bangkok Metropolitan Administration
Main Contract : Krungtep Thanakom
Project Cost : 30.0 Million Bath
Prportion (%) :90
Performance Year : December 2542-January 2544
Cost of Work Responsible : 28.0 Million Bath
Work Features : Supervision
Detail of Works : Service on surveying, conceptual and preliminary designs for the Department of Public Works. Also including for extraordinary work which need for special expertise recommendation.
|
|
Project Name : |
In-house Engineering Service for Survey, Design , and Analysis for Bridge and Road, Phase 3
|
Project Owner : Bangkok Metropolitan Administration
Main Contract : Krungtep Thanakom
Project Cost : 19.0 Million Bath
Prportion (%) : 90
Performance Year : March 2542-September 2542
Cost of Work Responsible : 19.5 Million Bath
Work Features : Supervision
Detail of Works : Service on surveying, conceptual and preliminary design for the Department of Public Works. Also including for extraordinary work which need for special expertise recommendation.
|
|
Project Name : |
In-house Engineering Service for Survey, Design, and Analysis for Bridge and Road, Phase 2
|
Project Owner : Bangkok Metropolitan Administration
Main Contract : Krungtep Thanakom
Project Cost : 17.0 Million Bath
Prportion (%) : 90
Performance Year : July 2541-March 2542
Cost of Work Responsible : 15.3 Million Bath
Work Features : Supervision
Detail of Works : Service on surveying, conceptual and preliminary design for the Department of Public Works. Also including for extraordinary work which need for special expertise recommendation.
|
|
Project Name : |
In-house Engineering Service for Survey, Design, and Analysis for Bridge and Road, Phase 1
|
Project Owner : Bangkok Metropolitan Administration
Main Contract : Krungtep Thanakom
Project Cost : 4.0 Million Bath
Prportion (%) : 90
Performance Year : September 2540-January 2541
Cost of Work Responsible : 3.7 Million Bath
Work Features : Supervision
Detail of Works : Service on surveying, conceptual and preliminary design for the Department of Public Works. Also including for extraordinary work which need for special expertise recommendation.
|
|
|